
Plomly Shopify App: Pricing, Features & First-Adopter Watch
Key signals for Plomly
Plomly launched on May 28, 2026. Shoplist is watching for its first storefront installs and tracking pricing and listing changes in the meantime. Checked .
Sonar hasn’t detected Plomly on a store yet. Watching since its May 28, 2026 launch.
Plomly on the Shopify App Store
Shoplist reads Plomly’s App Store listing every day: where it ranks, what merchants say, what it charges and every edit it ships.
Where Shopify ranks Plomly
Shoplist reads Shopify’s full category listings every day, so a climb or a slip shows up the day it happens.
| Day | Custom products - Other | Custom product |
|---|---|---|
| Sep 3, 2026 | #133 | — |
| Sep 4, 2026 | #133 | — |
| Sep 5, 2026 | #134 | — |
| Sep 6, 2026 | #137 | — |
| Sep 7, 2026 | #136 | — |
| Sep 8, 2026 | #136 | — |
| Sep 9, 2026 | #136 | — |
| Sep 10, 2026 | #135 | — |
| Sep 11, 2026 | #173 | — |
| Sep 12, 2026 | #172 | — |
| Sep 13, 2026 | #173 | — |
| Sep 14, 2026 | #172 | — |
| Sep 15, 2026 | #115 | — |
| Sep 17, 2026 | #119 | — |
| Sep 19, 2026 | #118 | — |
| Sep 20, 2026 | #115 | — |
| Sep 21, 2026 | #118 | — |
| Sep 22, 2026 | #117 | — |
| Sep 23, 2026 | #116 | — |
| Sep 24, 2026 | #116 | — |
| Sep 25, 2026 | #143 | — |
| Sep 26, 2026 | #143 | — |
| Sep 27, 2026 | #142 | — |
| Sep 28, 2026 | #141 | — |
| Sep 29, 2026 | #142 | — |
| Sep 30, 2026 | #107 | — |
| Oct 1, 2026 | #109 | — |
| Oct 2, 2026 | #108 | — |
| Oct 3, 2026 | #109 | — |
| Oct 4, 2026 | #92 | — |
| Oct 5, 2026 | #92 | — |
| Oct 6, 2026 | #93 | — |
| Oct 7, 2026 | #93 | — |
| Oct 8, 2026 | #88 | — |
| Oct 9, 2026 | #91 | — |
| Oct 10, 2026 | #91 | — |
| Oct 11, 2026 | #91 | — |
| Oct 12, 2026 | #90 | — |
| Oct 13, 2026 | #93 | — |
| Oct 14, 2026 | #93 | — |
| Oct 15, 2026 | #93 | — |
| Oct 16, 2026 | #93 | — |
| Oct 17, 2026 | #93 | — |
| Oct 18, 2026 | #92 | #483 |
| Oct 19, 2026 | #93 | — |
| Oct 20, 2026 | #84 | #488 |
| Oct 21, 2026 | #86 | — |
| Oct 22, 2026 | #88 | — |
| Oct 23, 2026 | #85 | — |
| Oct 24, 2026 | #84 | — |
| Oct 25, 2026 | #85 | #485 |
| Oct 31, 2026 | #88 | — |
| Nov 1, 2026 | #86 | — |
| Nov 2, 2026 | #85 | — |
| Nov 4, 2026 | #109 | — |
| Nov 5, 2026 | #106 | — |
| Nov 6, 2026 | #106 | — |
| Nov 7, 2026 | #108 | — |
| Nov 8, 2026 | #110 | — |
What Plomly charges
Free plan available. Every plan on its listing, and every price change Shoplist has caught, so you can see exactly how it packages and prices.
Free
Free
Pro
$14.99/month
Premium
$34.99/month
Every edit Plomly ships to its listing
Titles, prices, screenshots and featured spots, diffed line by line. A competitor’s listing edits are its strategy, in public.
Integrations updated
Integrations updated
Integrations updated
Integrations updated
Integrations updated
How Plomly sells itself on the App Store
The pitch, integrations and features merchants see before they install: the positioning a competitor is betting on.
“AI calculator for stores selling tile, paint, flooring, wallpaper & home materials”
What it does
Plomly is the only Shopify app that combines a measurement calculator with an AI shopping assistant — built for stores selling tile, paint, flooring, wallpaper, concrete, fence, and materials sold by m² or ft². Customers describe their project — "I'm tiling a… Plomly is the only Shopify app that combines a measurement calculator with an AI shopping assistant — built for stores selling tile, paint, flooring, wallpaper, concrete, fence, and materials sold by m² or ft². Customers describe their project — "I'm tiling a 5m² bathroom" — and Plomly reads YOUR catalog, recommends the right products with quantities, and builds the cart in one click. Most calculators are generic. Plomly is engineered for construction & home improvement stores.
Plomly listing facts
- Developer
- Nelesis development
- Launched
- May 28, 2026
- Shopify rank
- #110 in Custom products - Other
- Languages
- English, Spanish
Shopify stores using Plomly
Shoplist is watching Shopify storefronts for the first public install of Plomly.
How Plomly’s install base is moving
Shoplist re-crawls the same storefronts, so every store that adds Plomly, comes back to it or removes it shows up here. The store count also grows when Shoplist finds stores already running it; the breakdown keeps those apart from real installs.
Stores, last 28 days
0
0 now · 0 28 days earlier
Reach
0%
of the stores Shoplist tracks
Big-brand share
Not enough data: fewer than 150 of its stores have a known size
Where Plomly’s store count change came from
- Real installs and removalsEstimated0 added · 0 came back · 0 removed
- 0
Stores adding and removing Plomly, by week
| Week of | Added or back | Removed | Net | Notes |
|---|---|---|---|---|
| Aug 31, 2026 | 0 | 0 | 0 | Estimated |
| Sep 7, 2026 | 0 | 0 | 0 | Estimated |
| Sep 14, 2026 | 0 | 0 | 0 | Estimated |
| Sep 21, 2026 | 0 | 0 | 0 | Estimated |
| Sep 28, 2026 | 0 | 0 | 0 | Estimated |
| Oct 5, 2026 | 0 | 0 | 0 | Estimated |
| Oct 12, 2026 | 0 | 0 | 0 | Estimated |
| Oct 19, 2026 | 0 | 0 | 0 | Estimated |
| Oct 26, 2026 | 0 | 0 | 0 | Estimated |
Compare Plomly
The apps in its App Store category, with the stores Shoplist detects on each and their listing ratings.
Alternatives to Plomly
Apps merchants weigh against Plomly, with their own detected stores and ratings.
Plomly vs Smart Area & Tile Calculator
Plomly vs CalcAI
Plomly vs MeasureLab Price Calculator
Plomly vs Options Price Calculator
Plomly vs Apippa‑Custom Price Calculator
Plomly vs Wizart Material Qty Calculator
Follow the apps you compete with and decide which changes deserve action. See the competitor-monitoring workflow.
Seen on the storefront, not guessed
If Shoplist shows Plomly on a store, it’s there. Every count on this page traces to code found on a live storefront, re-checked on every crawl.
Code-level
Found in the storefront’s own code
Shoplist matches the scripts, app blocks and pixels Plomly loads on each live storefront. No surveys, no developer-reported numbers, no model guessing installs from review counts.
Re-checked, so the count stays current
Shoplist keeps crawling the same storefronts. A store that uninstalls Plomly leaves the count on the next crawl, so you read today’s install base, not a high-water mark.
Daily
The App Store, read every day
Rank, reviews, pricing and every listing edit are captured daily, so a price change or a ranking slip shows up here the day it ships.
Two public sources, labelled on every section. Store data last checked .
Read the full methodologyQuestions about Plomly
Straight answers from the same data as the rest of this page. The full store list answers the rest.
Has Shoplist detected stores using Plomly yet?
Shoplist has not yet found reliable public storefront evidence for Plomly. The page tracks first merchant evidence as it appears.
What does first-adopter watch mean?
It means Shoplist is monitoring launch context, first storefront-detectable merchant evidence, pricing, and listing changes.
Can I get alerts when stores start using Plomly?
Yes. Create a watchlist to get alerted when Shoplist finds public merchant evidence for Plomly.
Go beyond Plomly
Its closest rival, its developer and the charts it competes on, from the same data.
- Plomly vs Smart Area & Tile CalculatorDetected stores, store movement, ratings and pricing side by side.
- Nelesis developmentEvery app Nelesis development publishes, with their detected reach.
- Top apps by categoryThe ten apps gaining the most detected installs in each category.
- All Shopify appsBrowse every app Shoplist tracks, by category, rating, and reach.
Keep watching Plomly.
Get alerted on first storefront installs, review spikes, pricing changes, and listing edits.













